Metal Building Erector

Also called: Pre-Engineered Metal Building Erector, Steel Building Erector

Assembles pre-engineered steel buildings like warehouses, barns, churches and shops from kit parts.

A day in the life

Your crew stands up steel frames with a lift, bolts on purlins and girts, then screws down roof and wall panels. A big warehouse goes up in a few weeks. Many crews travel from town to town.

Pay over a career

Starting
$35k
Typical
$46k
High
$64k

Estimated.

Approximate: anchored on Bureau of Labor Statistics data for a broader job group.

Training

High school diploma, about 0 years after high school. High school diploma or less; learned on the job.

Ways in: On-the-job training. Training cost: Get paid while you train.

Outlook

Growing about average (about 4% over 10 years). Structural iron and steel workers overall.

Will it last? Our AI estimate

Low risk for 10 years. Kit buildings are factory-designed, but bolting columns, girts and roof panels together on-site is manual crew work.

Could start right away

Age 18+. One way to start: Apply to metal building erection crews; no experience needed

Start now, in high school

Classes: Geometry, Shop class.

Official data: O*NET occupation 47-2221.

More Ironwork, Rigging & Cranes careers

Career Universe is an early version. Pay, training and AI-risk figures are estimates to start your own research, not verified facts. The research was written with AI research assistants, checked by validation scripts and spot-checked by hand. Check anything important with schools, employers and official sources. How the numbers work.