Nuclear Decommissioning Specialist

Also called: Decommissioning Project Manager

Takes apart retired nuclear plants safely, piece by piece.

A day in the life

You plan how to cut up a reactor vessel underwater with robotic saws, pack the pieces into shielded containers, and track every bit of radioactive waste.

Pay over a career

Starting
$65k
Typical
$95k
High
$140k

Approximate: anchored on Bureau of Labor Statistics data for a broader job group.

Training

Bachelor's degree (4-year), about 4 years after high school. Engineering or science degree, or years of nuclear plant experience.

Ways in: 4-year college, On-the-job training. Training cost: $15k – $60k.

Majors to look at: Nuclear Engineering, Civil Engineering.

Outlook

Growing about average. Steady as older plants retire.

Will it last? Our AI estimate

Low risk in 5 years, medium in 10. Remote-controlled robots cut up reactor parts more each year; planning, safety and oversight still need people.

Start now, in high school

Classes: Chemistry, Physics, Construction CTE class.

Official data: O*NET occupation 47-4041.

More Nuclear Power careers

Career Universe is an early version. Pay, training and AI-risk figures are estimates to start your own research, not verified facts. The research was written with AI research assistants, checked by validation scripts and spot-checked by hand. Check anything important with schools, employers and official sources. How the numbers work.