Also called: Critical Facilities Engineer, Mission Critical Engineer
Keeps giant AI data centers powered and cool, using as little energy as possible.
You plan the power supply for a new building that uses as much electricity as a small city, test backup generators, and design liquid cooling for racks of AI chips running red-hot.
Approximate: anchored on Bureau of Labor Statistics data for a broader job group.
Bachelor's degree (4-year), about 4 years after high school. Bachelor's in electrical or mechanical engineering.
Ways in: 4-year college, Military. Training cost: $15k – $60k.
Majors to look at: Electrical Engineering, Mechanical Engineering.
Growing faster than average (about 7% over 10 years).
Low risk in 5 years, medium in 10. AI tunes cooling automatically, but the AI data-center boom needs engineers to design and fix power and cooling.
Classes: AP Physics, AP Calculus, Computer science.
Official data: O*NET occupation 17-2071.
Career Universe is an early version. Pay, training and AI-risk figures are estimates to start your own research, not verified facts. The research was written with AI research assistants, checked by validation scripts and spot-checked by hand. Check anything important with schools, employers and official sources. How the numbers work.